supply_chain

PMET Wins C$1.2M Federal Grant for Quebec Lithium Access Road

Image
PMET Wins C$1.2M Federal Grant for Quebec Lithium Access Road

MONTREAL – October 29, 2026 -- Natural Resources Canada has approved C$1,215,185 for PMET Resources Inc. to upgrade the access road serving its Shaakichiuwaanaan lithium project in Quebec's Eeyou Istchee James Bay region.

NRCan funding targets 20 kilometers of road to the Trans-Taiga corridor

The money comes from NRCan's First and Last Mile Fund (FLMF). The application was approved under the Critical Minerals Infrastructure Fund, which has been integrated into the FLMF. The contribution goes to Innova Lithium, a wholly owned PMET subsidiary.

The project will upgrade about 20 kilometers of PMET's 100%-owned road linking the Trans-Taiga Road to the property. The upgrade is meant to improve the road's reliability and capacity for increased mining activity. The property is already accessible year-round by all-season road and sits near regional hydroelectric power infrastructure.

Rio Tinto Opens ~$1.4B Lithium Projects in Argentina

Catamarca – October 29, 2026 -- Rio Tinto has formally opened its Fénix 1B expansion and Sal de Vida operation in Argentina's Catamarca province after a combined investment of around $1.4 billion, adding 25,000 tonnes of annual lithium carbonate equivalent (LCE) capacity once fully ramped up.

Both projects reached first production in the second quarter, ahead of plan

Both assets are now ramping up. Argentine President Javier Milei and Catamarca Governor Raúl Jalil joined Rio Tinto Chief Executive Simon Trott at the inauguration, along with employees, suppliers and representatives of local and Indigenous communities.

Milei called the Fénix expansion a historic milestone and said Argentina had again created incentives for producing essential resources.

Honeywell Aerospace Commits $500M to New Tempe Plant, 600 Jobs

Image
Honeywell Aerospace Commits $500M to New Tempe Plant, 600 Jobs

Phoenix – October 29, 2026 -- Honeywell Aerospace (NASDAQ: HONA) will invest $500 million in a 300,000-square-foot manufacturing facility in Tempe, Arizona, to expand capacity for commercial aviation and defense programs. The plant is scheduled to open in late 2028.

Digital production system and in-house machining target supply constraints

The facility will feature an integrated digital production system, modular robotics, automated inspection, digital twins and an end-to-end digital thread. It will add internal complex machining capability, which Honeywell describes as a key area of its supply base that is currently constrained.

The plant also moves the company toward a more vertically integrated production system for next-generation products, including Assure advanced actuation systems and Attune vapor cycle cooling subsystems.

Honeywell Aerospace Lifts Guidance, Declares First $0.40 Dividend

Image
Honeywell Aerospace Lifts Guidance, Declares First $0.40 Dividend

PHOENIX – October 29, 2026 -- Honeywell Aerospace (Nasdaq: HONA) raised its full-year 2026 pro forma standalone adjusted earnings per share and second-half free cash flow guidance after third-quarter sales rose 2% to $4.6 billion, and its board declared an inaugural quarterly dividend of $0.40 per share.

Net income came to $0.7 billion. Adjusted EBIT rose 1% to $1.2 billion, even with new costs of operating as an independent public company and a net benefit of about $50 million from International Emergency Economic Powers Act (IEEPA) tariff refunds. The company kept its full-year organic sales outlook and narrowed its adjusted EBIT guidance range.

Wesco Q3 Sales Hit $7.2B as Data Center Revenue Jumps 55%

Image
Wesco Q3 Sales Hit $7.2B as Data Center Revenue Jumps 55%

PITTSBURGH – October 29, 2026 -- Wesco International reported record third-quarter net sales of $7.2 billion, up 17% year over year and 8% sequentially, and raised its full-year 2026 outlook as backlog grew about 80%.

Data center sales rise about 55% to $1.8 billion

Data center sales reached $1.8 billion, up roughly 55% from a year earlier. Non-data center sales rose 7%. Organic sales grew 16.6%, with volume gains in all three segments (CSS, EES and UBS) and a favorable price effect. Organic sales for the first nine months rose 13.9%.

Total company backlog hit a record, and each of the three business units set its own backlog record. CEO John Engel said the growth is fueled by multi-year customer commitments, and that the past five consecutive quarters of double-digit sales growth show a growth profile that extends beyond data centers.

SupplyOne Pitches Custom Corrugated Packaging to Cut Waste, Returns

Image
SupplyOne Pitches Custom Corrugated Packaging to Cut Waste, Returns

United States – October 29, 2026 -- SupplyOne is marketing engineering-led custom corrugated packaging that combines product protection, retail branding and supply chain services for manufacturers, distributors and e-commerce businesses.

The company's nationwide team of packaging engineers and designers covers structural concepts, prototypes, custom die-cuts, printed shipping boxes and retail-ready displays.

SupplyOne right-sizes boxes to reduce excess material and damage-related returns

Engineers align box dimensions, board grade, interior protection and structural features to cut excess materials and wasted space. SupplyOne says this can lower damage risks during handling, transportation and storage, reduce damage-related returns and improve total packaging costs across the supply chain.

Aberdeen Carolina & Western Railway Wins $19.9M CRISI Rail Grant

Image
Aberdeen Carolina & Western Railway Wins $19.9M CRISI Rail Grant

Charlotte – October 29, 2026 -- Aberdeen Carolina & Western Railway (ACWR) has been awarded a $19.9 million federal grant through the U.S. Department of Transportation's Consolidated Rail Infrastructure and Safety Improvements (CRISI) Program to rebuild track laid in the early to mid 1900s.

Grant funds 30 miles of continuous welded rail across two North Carolina counties

The project will replace the existing line with approximately 30 miles of continuous welded rail in Montgomery and Stanly counties. The grant supports a total rail infrastructure investment of $41 million. ACWR and the North Carolina Department of Transportation (NCDOT) will contribute a 52% non-federal match.

ACWR CEO Anthony Menzies said a healthy rail network is critical to "take freight off of our nation's highways."

Proxima Fusion, Fujikura Plan German HTS Tape Plant in Lower Saxony

Image
Proxima Fusion, Fujikura Plan German HTS Tape Plant in Lower Saxony

Munich/Tokyo – October 29, 2026 -- Proxima Fusion and Japan's Fujikura signed a memorandum of understanding to explore industrial-scale production of high-temperature superconductor (HTS) tape in Germany, anchored by planned demand of 60,000 kilometers from Proxima's own fusion projects. The MoU was signed in Tokyo in the presence of German Chancellor Friedrich Merz and Japanese Prime Minister Sanae Takaichi.

The production site is planned for Lower Saxony. The plant is meant to close a central gap in Europe's fusion supply chain, since HTS tape is currently made mostly outside Europe.

Vail Resorts Net Income Drops 47% After Historic Rockies Drought

Image
Vail Resorts Net Income Drops 47% After Historic Rockies Drought

Broomfield, Colo. – September 28, 2026 -- Vail Resorts, Inc. (NYSE: MTN) reported fiscal 2026 net income of $147.5 million, down from $280.0 million a year earlier, as the western U.S. ski industry endured what CEO Rob Katz called one of the most challenging winters in history.

Resort Reported EBITDA falls 11.7% to $745.7 million on weather losses

Full-year Resort Reported EBITDA declined $98.5 million to $745.7 million, including $11 million in one-time costs tied to the company's resource efficiency transformation plan. Resort Net Revenue fell $131.9 million, or 4.5%, driven by historically low snowfall and snowpack in the Rockies and Tahoe regions. Total lift revenue dropped 3.5% even as visitation fell 13.4%, cushioned by a 3.9% increase in pass revenue. In Australia, cumulative snowfall during the fourth quarter came in roughly 57% below the 10-year average, pressuring visitation despite growth in Australian pass sales.

SpiderOak Expands Defense Cyber Role From Space to Drones

Image
SpiderOak Expands Defense Cyber Role From Space to Drones

Reston, VA – October 29, 2026 -- SpiderOak, based in Reston, Virginia, has become a Blue UAS Recognized Assessor, delivering supply chain and cybersecurity evaluations for participating unmanned aircraft system (UAS) vendors, according to a March 3, 2026 announcement.

SpiderOak added drone assessment authority in October 2025 and March 2026

On October 20, 2025, SpiderOak was authorized to perform cybersecurity evaluations on UAS seeking compliance with US Government baseline requirements. The March 2026 Blue UAS Recognized Assessor role extends that work to supply chain evaluations for participating vendors.

SpiderOak services target the Army's Short-Range Reconnaissance program

On December 16, 2025, SpiderOak announced services to strengthen cyber resilience for the Army's Short-Range Reconnaissance (SRR) program. The services also cover future unmanned systems across all domains.