Skip to main content

HoyUltra 2000M

Hoymiles Cuts On-Site Storage Install Time to 10 Hours With New BESS

Image
Hoymiles Cuts On-Site Storage Install Time to 10 Hours With New BESS

Hangzhou, China – September 30, 2026 -- Hoymiles Power Electronics has launched HoyUltra 2000M, a commercial and industrial energy storage system that cuts required on-site construction work from an estimated 46 hours to 10 hours.

Integrated design shrinks system footprint by 15%

HoyUltra 2000M combines battery, power conversion system (PCS), thermal management, static transfer switch and fire protection into a single unit. Compared with a conventional setup using 10 storage containers in parallel, Hoymiles states the integrated design reduces system footprint by approximately 15% and lowers the volume of external equipment and on-site wiring needed.

Hoymiles Launches HoyUltra 2000M C&I Battery System in Budapest

Image
Hoymiles Launches HoyUltra 2000M C&I Battery System in Budapest

Budapest, Hungary – September 28, 2026 -- Hoymiles launched its HoyUltra 2000M full-scenario commercial and industrial (C&I) battery energy storage system (BESS) at the opening stop of its European C&I Energy Storage Roadshow, held in Budapest on September 24-25, 2026.

Hoymiles confirms more than 2 GWh of C&I storage capacity already operating worldwide

The HoyUltra 2000M platform spans small commercial installations to large-scale industrial deployments, positioning Hoymiles across the full range of C&I project sizes. Sixteen HoyUltra 2000M units are already running at a solar-plus-storage project in Hungary that roadshow participants toured on the second day.