Supply Chain

First Student, Con Edison Cut EV Bus Infrastructure Costs 13% in NYC

Image
First Student, Con Edison Cut EV Bus Infrastructure Costs 13% in NYC

Brooklyn, N.Y. – September 18, 2026 -- First Student and Con Edison have completed the first phase of an electric school bus infrastructure project in New York City, cutting charging infrastructure construction costs by 13% through a trenchless deployment method.

Trenchless charging technology avoids underground trenching costs in dense boroughs

The project's core innovation, First Student's First ChargeTM system, is a trenchless, modular charging infrastructure solution that bypasses traditional underground trenching. The approach reduced construction costs by 13% while minimizing disruption in Brooklyn and Queens, two of the most logistically complex urban environments in the United States for utility work.

Lytx Launches 360 Hub Kit to Close Fleet Blind Spots

Image
Lytx Launches 360 Hub Kit to Close Fleet Blind Spots

San Diego – September 18, 2026 -- Lytx Inc. has launched the Lytx 360 Hub Kit, a hub and auxiliary camera system that adds up to eight HD camera views around a vehicle's sides, rear, cargo area, and blind zones, extending its fleet video platform beyond forward-facing monitoring.

Lytx expands camera coverage to eight HD views per vehicle

The 360 Hub Kit integrates up to four HD auxiliary camera views out of the box, expandable to eight, covering sides, rear, cargo, and blind-zone perspectives. Footage is automatically surfaced in Lytx Video Search and synchronized with the company's existing DriveCam recordings, giving safety teams a single vehicle timeline instead of separate video streams.

Mindray Launches SV70 Ventilator to Fill Philips V60 Gap

Image
Mindray Launches SV70 Ventilator to Fill Philips V60 Gap

United States – September 18, 2026 -- Mindray North America has launched the SV70 non-invasive ventilator in the United States, targeting respiratory departments left scrambling after Philips withdrew its V60 device, the previous clinical standard in non-invasive ventilation.

Philips V60 withdrawal forces hospitals into fleet-wide equipment replacements

The exit of the V60 from the market has created operational and financial strain on respiratory departments, pushing hospitals into large-scale replacement cycles while they try to preserve clinical familiarity, workflow continuity and patient safety. Mindray designed the SV70 specifically to absorb that transition without disrupting existing clinical routines.

MapUp's NavGuru Adds Live Truck Parking, Bridge Data to Cut Fuel Costs

Image
MapUp's NavGuru Adds Live Truck Parking, Bridge Data to Cut Fuel Costs

Silicon Valley – September 18, 2026 -- MapUp, Inc. has expanded its NavGuru navigation platform to embed live truck parking, weigh station, wash and low-bridge data directly into fleet routing screens, aiming to close a compliance gap that costs a 3,000-truck fleet an estimated $5 million a year.

Fuel-plan compliance jumped from 74% to 98% in four months

At one dedicated carrier operating more than 2,500 trucks, fuel-prescription compliance rose from 74% to above 98% within four months of integrating the fuel plan into driver navigation, according to MapUp. The company says a plan followed only three-quarters of the time forfeits a quarter of its projected savings before any results are booked.

Transformer Oil Market to Hit $2.87B by 2031 as Grids Modernize

Image
Transformer Oil Market to Hit $2.87B by 2031 as Grids Modernize

Delray Beach, Fla. – September 18, 2026 -- The global transformer oil market is projected to grow from $2.18 billion in 2026 to $2.87 billion by 2031, expanding at a compound annual growth rate of 5.6%, according to MarketsandMarkets. The market stood at $2.07 billion in 2025.

Grid modernization and renewable integration drive new demand

Utilities and grid operators are accelerating investment in transmission and distribution infrastructure, replacing aging transformers and expanding high-voltage networks to evacuate renewable power. This buildout is fueling demand for insulating fluids used for electrical insulation and heat dissipation in both new and refurbished transformers.

Electra Taps Atlas Group to Build EL9 Airframes for 2027 Delivery

Image
Electra Taps Atlas Group to Build EL9 Airframes for 2027 Delivery

Manassas, Va. and Wichita, Kan. – September 18, 2026 -- Electra and The Atlas Group have signed an airframe manufacturing agreement for the EL9 Ultra Short aircraft, with Atlas set to build and assemble airframes for Electra's flight test and certification program starting this month.

Atlas begins airframe production this month with first deliveries targeted for 2027

Work commences at Atlas facilities immediately, feeding Electra's certification campaign for the nine-passenger hybrid-electric EL9, which is designed to take off and land in as little as 150 feet. The two companies will jointly mature production architecture and reduce manufacturing risk ahead of scaled output.

"Realizing this vision requires more than a breakthrough aircraft; it requires the ability to build and deliver it with the consistency and scale of an advanced production system," said Marc Allen, CEO of Electra.

Wildfire Triples Ad Bookings as Commerce Network Hits 72x ROAS

Image
Wildfire Triples Ad Bookings as Commerce Network Hits 72x ROAS

San Diego – September 18, 2026 -- Wildfire Systems has tripled quarterly booking volume on its Wildfire Commerce Network (WCN), with 235 unique advertisers now recording returns on ad spend of up to 72x.

Advertiser growth accelerates as brands chase measurable, closed-loop results

The San Diego-based loyalty and consumer insights platform said the surge is driven by advertisers in banking, fintech and travel who are increasingly targeting WCN's high-intent shopper audiences across client networks including KashKick, Shop Your Way and Travel Arrow. Top advertisers are rebooking five to seven times per year, while a growing pool of new brands is launching campaigns on the network. In the second quarter of 2026, 54% of WCN bookings came from net-new advertisers, according to Wildfire.

Claigan to Host Dual Webinars on 2027 Compliance Budgeting

Ottawa, ON -- Claigan Environmental will run two identical webinars on September 18, 2026, to help manufacturers budget for restricted materials compliance requirements taking effect in 2027.

Two sessions scheduled same day due to expected demand

Claigan will hold back-to-back one-hour sessions at 10am and 2pm on September 23, each including a question-and-answer segment. The company cited anticipated demand as the reason for scheduling duplicate webinars rather than a single event.

USG Water Solutions Names Christina Coen as New CEO

Image
USG Water Solutions Names Christina Coen as New CEO

Atlanta – September 18, 2026 -- USG Water Solutions has appointed Christina Coen as Chief Executive Officer, effective September 1, 2026, succeeding John Flaugher, who moves into a strategic advisory role.

Coen brings chemicals and agtech leadership to water infrastructure

Coen joins from UPL Corp, where she served as Chief Transformation Officer, R&D and Sustainability Lead, and previously as Chief Marketing Officer overseeing global P&L for a multi-billion-dollar portfolio. Her prior roles span senior leadership positions at Nalco Water (an Ecolab Company), FMC Corporation, and Dow Chemical, covering R&D, transformation, marketing, and commercial leadership in agricultural and specialty chemicals.

SENS PowerCab2 Cuts Data Center DC Power Costs by Up to $80M

Image
SENS PowerCab2 Cuts Data Center DC Power Costs by Up to $80M

Longmont, Colo. – September 18, 2026 -- Stored Energy Systems (SENS) says its PowerCab2 platform can save data center operators an estimated $20 million to $80 million on a typical 1 gigawatt campus by eliminating dedicated battery rooms and consolidating hundreds of discrete DC power components into a single factory-tested system.

PowerCab2 removes over 300 square feet of battery-room space per structure

The integrated platform typically eliminates more than 300 square feet of dedicated battery-room space from a power distribution center (PDC) or E-house. At an estimated installed cost of $850 per square foot, SENS calculates capital savings of roughly $255,000 per structure.