COPENHAGEN -- November 25, 2026 -- NKT A/S reported Q3 2026 operational EBITDA of EUR 111 million, down from EUR 119 million a year earlier, in its interim report of 19 November. The cable maker kept its 2026 outlook and now expects operational EBITDA in the upper end of its EUR 400-430 million range.
NKT holds 2026 guidance while standard-metal revenue falls 7%
Revenue at standard metal prices fell to EUR 673 million from EUR 726 million in Q3 2025, a drop of EUR 53 million, or about 7%. The company puts organic growth at -7%. Operational EBITDA fell about 7% (EUR 8 million) over the same period, so the operational EBITDA margin on standard-metal revenue held at 16.6%, up 0.2 percentage points.
Reported revenue moved the other way. It rose to EUR 966 million from EUR 936 million, an increase of about 3%.
NKT says the decline was expected. It attributes it to the Transmission and Grid Solutions & Accessories business lines, which faced a high comparison base from the Champlain Hudson Power Express project and repair jobs in Q3 2025, plus project timing. Both business lines reported lower operational EBITDA. Distribution posted positive organic growth and higher operational EBITDA, helped by the ramp-up of additional medium-voltage capacity in Asnaes, Denmark.
The full-year outlook calls for revenue of approximately EUR 2.65-2.75 billion at standard metal prices. NKT bases it on assumptions that include stable market conditions and a stable supply chain with limited disruptions.
Transmission backlog drops EUR 0.6 billion in the quarter, excluding TenneT awards
The Transmission order backlog stood at EUR 12.4 billion at the end of Q3 2026, down from EUR 13.0 billion at the end of Q2. That is a decline of about 5%. At standard metal prices the backlog fell to EUR 11.0 billion from EUR 11.6 billion, about 5% as well. NKT attributes the reduction to project execution during the quarter.
The backlog excludes five projects awarded under a framework agreement with Dutch-German transmission system operator TenneT. NKT estimates their value at more than EUR 2.5 billion, equivalent to roughly 20% of the reported backlog by our calculation. The company did not disclose when these awards will enter the backlog.
Free cash flow turns EUR 127 million negative as capacity projects absorb cash
Free cash flow was EUR -127 million in Q3 2026. NKT cites a negative contribution from working capital and ongoing investment in capacity. Net interest-bearing debt was EUR -471 million, meaning NKT holds net cash. The quarter's outflow equals about 27% of that position.
The capacity programme is moving on several fronts:
- Medium-voltage capacity in Portugal becomes operational gradually during Q4 2026.
- Commercial operation of the Karlskrona, Sweden, expansion is expected to start ramp-up in Q2 2027. NKT says this is slightly ahead of the original plan and allows a more controlled ramp-up.
- Additional capacity at the high-voltage factory in Cologne, Germany, and the second cable-laying vessel are expected to become operational in 2027.