News

Equinix Opens $290M SG6 Singapore Data Center for AI Workloads

Image
Equinix Opens $290M SG6 Singapore Data Center for AI Workloads

Redwood City – November 06, 2026 -- Equinix, Inc. (Nasdaq: EQIX) has opened SG6, its sixth International Business Exchange (IBX) data center in Singapore, with an initial investment of approximately $290 million. The first phase delivers 8 MW of capacity and roughly 1,550 cabinets, and full build-out will reach up to 20 MW of IT capacity.

SG6 targets high-density GPU deployments with liquid cooling

The facility is designed for AI, high-performance computing and data-intensive workloads. It uses proprietary cooling systems and liquid-cooling capabilities built to accommodate power-intensive GPU infrastructure.

SG6 is among the first data centers developed under Singapore's Data Centre Call for Application framework. It adds to Equinix's global footprint of more than 280 data centers.

AOK: Only 24% of Innovation Fund Care Projects Advance to Routine Care

Berlin – November 06, 2026 -- Germany's Innovation Fund has paid out more than €2 billion since 2016, yet only 24% of its completed new-care-model projects received a decision to examine continuation in routine care, according to AOK-Bundesverband. The statutory health insurer presented its proposals at a congress marking the fund's tenth anniversary, hosted by the Innovation Committee at the Federal Joint Committee (G-BA).

Half of 146 completed care-model projects received no recommendation

The fund has supported more than 850 projects. Of these, 270 fall under new care models and 591 under health services research. Half of the 146 completed new-care-model projects received no recommendation for further use.

Halfpricesoft ez1099 2026 Files to IRS IRIS Without a TCC

Image
Halfpricesoft ez1099 2026 Files to IRS IRIS Without a TCC

Redmond – November 06, 2026 -- Halfpricesoft.com has released ez1099 2026 with built-in direct filing through the IRS Information Returns Intake System (IRIS), removing the need for businesses to obtain an IRS Transmitter Control Code (TCC) before e-filing 1099s.

Halfpricesoft transmits returns on the filer's behalf, bypassing what the company describes as a weeks-long IRS application and verification cycle. The release comes as the IRS FIRE system is set to be retired on December 31, 2026.

ez1099 2026 adds Form 1099-DA support for digital asset reporting

The version is available for the 2027 tax season. It supports Form 1099-DA reporting of digital asset transactions, crypto sales and broker exchanges under IRS rules. Direct transmission carries forward, so forms are submitted from the software without external portal uploads.

iQIYI's NadouPro AI Rebuilds Film Lost for Nearly 90 Years

Image
iQIYI's NadouPro AI Rebuilds Film Lost for Nearly 90 Years

Beijing – November 06, 2026 -- iQIYI used its NadouPro AI platform to recreate "Visiting Shanghai after Sixty Years", a 1938 film lost for nearly 90 years, with an eight-person team in two months. The project is shortlisted for the "2026 Future Images AI Unit" at the 39th Golden Rooster Awards, one of China's most prestigious film honors.

Team rebuilds film from stills, posters and newspaper clippings

The team at the iQIYI-XMU Joint Laboratory of Film Restoration had no surviving prints, reels or scripts of one of China's earliest science-fiction works, a comedy imagining life sixty years ahead. Instead of repairing damaged footage, the team generated the film from scratch. Its only guides were production still-photos, posters and newspaper clippings.

TCL CSOT Starts Equipment Move-In at RMB 29.5bn IJP OLED Fab

Image
TCL CSOT Starts Equipment Move-In at RMB 29.5bn IJP OLED Fab

Guangzhou – November 06, 2026 -- TCL CSOT has begun moving core production equipment into its t8 plant in Guangzhou, a RMB 29.5 billion ($ amount not stated) 8.6-generation inkjet printing OLED (IJP OLED) line that the company describes as the world's first of its kind. Equipment move-in began on October 31, and mass production is expected in the fourth quarter of 2027.

Line is designed for 22,500 substrates a month

The t8 line has a designed monthly capacity of about 22,500 glass substrates, each measuring roughly 2,290 mm x 2,620 mm. It will mainly produce displays for tablets, laptops and monitors, with scope to expand into flexible and foldable panels.

Main structure topped out in 226 days

Construction started on September 16, 2025. The main factory structure was topped out in 226 days. The project now moves through production line installation, integrated commissioning of power systems and process validation.

EPG Tops Out US$120M Modular Data Center Plant in Johor

Image
EPG Tops Out US$120M Modular Data Center Plant in Johor

JOHOR BAHRU – November 06, 2026 -- EPG Modular Data Center has topped out its roughly US$120 million Free Industrial Zone (FIZ) factory in Senai Airport City (SAC), Johor. The 107,450-square-meter site is scheduled for completion in the first quarter of 2027.

Plant is projected to rank among the largest single-site MDC module bases

The facility includes 70,000 square meters of production space. By production capacity, it is projected to rank among the largest single-site data center module manufacturing bases in the modular data center (MDC) sector. Once fully operational, it is expected to employ more than 800 people locally.

The topping-out ceremony featured the raising of the final structural beam and a facility tour. Guests included representatives of the Johor State Government, SAC and other government agencies, along with business partners, customers, financial institutions and investment firms.

HSBC Raises Tender Cap to $1.5bn for 6% CoCo Securities

LONDON – November 06, 2026 -- HSBC Holdings plc has raised the maximum tender amount in its cash offer for 6.000% perpetual subordinated contingent convertible securities to $1.5 billion from $1 billion, to proactively manage its Tier 1 capital base.

The offer targets the outstanding $3 billion 6.000% Perpetual Subordinated Contingent Convertible Securities, callable May 22, 2027 and every five years thereafter. The original cap of $1 billion was announced on 5 November 2026. All other terms of the offer remain unchanged.

ACER: EU Grid Investment Triples to €30.5bn as Congestion Costs Rise

Image
ACER: EU Grid Investment Triples to €30.5bn as Congestion Costs Rise

Europe – November 06, 2026 -- Annual investment in European electricity transmission nearly tripled from €10.4 billion in 2019 to €30.5 billion in 2025. Permitting delays and congestion costs are still pushing up consumer bills, according to ACER's 2026 Monitoring Report on energy infrastructure development.

The report tests whether electricity, gas and hydrogen networks are keeping pace with changing demand. Renewable generation is expanding, and electricity demand is growing from heat pumps, electric vehicles and data centres. Gas networks must adapt to lower demand, while hydrogen remains at an early stage.

Cross-border project delays cost about €4 billion per year of slippage

On average, 22% of electricity transmission projects of common interest (PCIs) and mutual interest (PMIs) are delayed each year, mainly because of lengthy permitting procedures. A one-year delay costs around €4 billion in lost economic welfare.

ERAYAK Ruike Plant Nears Acceptance; 16 kW Generator Next

Image
ERAYAK Ruike Plant Nears Acceptance; 16 kW Generator Next

WENZHOU – November 06, 2026 -- Erayak Power Solution Group (Nasdaq: RAYA) said the new Ruike Electronics (Wenzhou) facility has entered final construction acceptance. The energy storage portion carries a planned annual design capacity of 150 MWh, and the company's 16 kW tri-fuel inverter generator is approaching pilot production.

Ruike facility adds capacity, with phased start-up through Q4 2027

The Ruike facility adds to ERAYAK's manufacturing footprint and does not replace existing capacity. The company expects acceptance of all main buildings to be completed in the first quarter of 2027. Production on relevant lines is planned to start in phases from the fourth quarter of 2026 through the fourth quarter of 2027, subject to acceptance results, equipment commissioning and product introduction schedules.

Ares Commercial RE Posts $10.0M Q3 Profit, Repays $90M Loan

Image
Ares Commercial RE Posts $10.0M Q3 Profit, Repays $90M Loan

New York – November 06, 2026 -- Ares Commercial Real Estate Corporation (NYSE:ACRE) reported third-quarter 2026 GAAP net income of $10.0 million, or $0.18 per diluted common share, and fully repaid and terminated a $90 million secured term loan after the quarter closed.

Distributable Earnings, a non-GAAP measure, reached $6.7 million, or $0.12 per diluted common share. The company said a gain on the sale of its REO office property contributed to the quarter's results.

Ares Commercial Real Estate cuts office and REO exposure

Reducing office and real estate owned (REO) investments remains a strategic priority, CEO Bryan Donohoe said. He added that the diversified loan portfolio continues to show overall stability, backed by the Ares Real Estate Debt platform.

CFO Jeff Gonzales said management is focused on its risk rated 4 and 5 loans. Resolving them would "advance the repositioning of our portfolio and enhance our future earnings."