AI Infrastructure & Data Centers

Z Squared Buys Energized Arkansas Site, Eyes 150+ MW AI Capacity

Ft. Lauderdale – September 13, 2026 -- Z Squared Inc. (Nasdaq: ZSQR) closed its all-stock acquisition of Paradox Data, LLC, gaining an energized computing campus in El Dorado, Arkansas, with an existing 8.0 MW electric service arrangement and a phased target of 150+ MW of AI-ready capacity.

Deal closes with zero cash and no debt financing

Z Squared paid entirely in stock for Paradox Data, LLC, acquired from Paradox Infrastructure LLC, incurring no cash outlay or debt at closing. The transaction hands the company its first owned, energized computing site, the Union County Campus, as it builds out an AI colocation business.

NourNet Launches Sovereign AI Agent Platform, Expands Data Center to 10 MW

Image
NourNet Launches Sovereign AI Agent Platform, Expands Data Center to 10 MW

Riyadh – September 13, 2026 -- NourNet, a Saudi digital services provider, closed its participation at LEAP 2026 by unveiling a beta AI Agent Platform and expanding its flagship data center to 10 MW and up to 750 racks.

NourNet's new platform keeps AI workloads inside the Kingdom

The AI Agent Platform combines Agentic AI with Inference-as-a-Service, letting organizations build, deploy and operate intelligent agents that automate operational tasks, execute multi-step workflows and interact with enterprise data. Hosted entirely within NourNet's Saudi data centers, the platform offers Arabic-tuned and multilingual models while ensuring customer data and AI workloads do not leave the Kingdom.

VIAVI Unveils 1.6T Test Suite for AI Data Centers at ECOC 2026

Image
VIAVI Unveils 1.6T Test Suite for AI Data Centers at ECOC 2026

Chandler – September 13, 2026 -- VIAVI Solutions Inc. (NASDAQ: VIAV) will present a full-stack data center test portfolio at booth 1001 during ECOC 2026, running September 21-23 at the FYCMA exhibition center in Malaga, Spain.

Hyperscalers push 1.6T rollouts while planning for 3.2T networks

Cloud providers are deploying 1.6T technologies within racks, across clusters and between data centers as AI infrastructure scales, with 3.2T architectures already in planning. These builds depend on 16x224G and 8x448G lane designs enabled by Silicon Photonics, Co-packaged Optics (CPO) and dense optical connectivity, driving sharp growth in fiber density and multifiber interconnects.

Polarise Secures 15 MW at CRA's Prague Gateway Data Center

Image
Polarise Secures 15 MW at CRA's Prague Gateway Data Center

Düsseldorf/Prague – September 13, 2026 -- Polarise, a European sovereign AI cloud provider, has signed a cooperation agreement with Czech infrastructure operator Ceske Radiokomunikace (CRA) to secure 15 MW of capacity at CRA's new "Prague Gateway" data center in Jiloviste near Prague, along with exclusive rights for further expansion at the site.

Polarise enters Central Europe with its first confirmed site partnership

The deal marks Polarise's first concrete location partnership in its expanding network of AI-ready sites across Europe and its entry into the Central European market. Prague Gateway is a purpose-built AI data center designed for liquid-cooled infrastructure and compatible with current and future GPU generations, with operational readiness targeted for mid-2027 across multiple expansion phases.

ABB, BCG Report: DC Power to Anchor Future AI Data Center Grids

Image
ABB, BCG Report: DC Power to Anchor Future AI Data Center Grids

Zurich – September 13, 2026 -- ABB has published a report with Boston Consulting Group (BCG) arguing that direct current (DC) technology is shifting from a niche application to a central component of industrial, commercial and digital power infrastructure, with decisions made over the next two to three years determining which market players lead the transition.

800 VDC distribution emerges as defining architecture for AI infrastructure

The report identifies AI data centers as the most immediate driver of DC adoption, finding that conventional electrical architectures are reaching practical limits as AI workloads push power density requirements higher. It concludes that 800 VDC distribution is emerging as the defining architecture for next-generation AI infrastructure, enabling operators to maximize compute capacity within constrained grid connections while improving energy efficiency.

ModelBest Launches 2B-Parameter Edge AI Model, Tops Open-Source Rankings

Beijing – September 13, 2026 -- ModelBest, a Chinese AI startup, has released MiniCPM5-2B, a 2-billion-parameter open-source language model that ranks first on the Artificial Analysis Intelligence Index among open-source models under 4 billion parameters. The model, built in collaboration with the OpenBMB open-source community, also scored 20 on the Agentic Index, a metric measuring autonomous task-execution capability, outpacing peers in its size category.

Model runs agentic tasks natively on edge hardware without cloud dependency

MiniCPM5-2B natively supports tool calling, deep search, code generation, and multi-step reasoning despite its compact parameter count. ModelBest positions the release as evidence that increasing 'intelligence density' rather than scaling parameter counts can deliver strong performance within the compute, memory, and power constraints typical of edge devices such as PCs, smartphones, robotics, and IoT hardware.

Accels Launches AI Token Financing Platform, Eyes $2.5T Market

Singapore – September 13, 2026 -- Accels has launched a combined AI infrastructure and financial services platform aimed at businesses building autonomous AI agents, betting that token consumption will replace seats and subscriptions as the core unit of AI economic activity.

Goldman Sachs projects a 24-fold surge in global AI token consumption by 2030

Separate industry forecasts cited by the company put annual token-related spending rising from roughly $200 billion today to as much as $2.5 trillion a year, driven largely by AI agents operating continuously rather than responding to occasional human queries.

Robo.ai Calls EGM to Approve 10-Fold Increase in Share Capital

Image
Robo.ai Calls EGM to Approve 10-Fold Increase in Share Capital

Dubai – September 13, 2026 -- Robo.ai Inc. (Nasdaq: AIIO) will ask shareholders to approve a tenfold expansion of its authorized share capital at an extraordinary general meeting scheduled for September 13, 2026, at 4:30 pm Dubai local time.

Robo.ai seeks to raise authorized capital from $400,000 to $4,000,000

The Dubai-based, Nasdaq-listed company is proposing to increase its authorized share capital from $400,000, divided into 200,000,000 shares, to $4,000,000, divided into 2,000,000,000 shares. The plan calls for creating an additional 225,000,000 Class A ordinary shares and 1,575,000,000 Class B ordinary shares, each carrying a par value of $0.002.

CleanSpark Gets ERCOT Batch Zero Nod for 885 MW in Texas

Image
CleanSpark Gets ERCOT Batch Zero Nod for 885 MW in Texas

Las Vegas – September 13, 2026 -- CleanSpark, Inc. (Nasdaq: CLSK) has received conditional batch zero classification from ERCOT covering 885 MW of contracted power capacity across its two Texas sites, the company disclosed in its unaudited August 2026 operations update.

ERCOT grants baseload and studied load designations for Texas capacity

The grid operator classified 585 MW of CleanSpark's contracted capacity for batch zero baseload designation and an additional 300 MW for batch zero studied load designation. CEO and Chairman Matt Schultz said the classification arrived as expected and reflects the company's continued cooperation with an audit directive from Governor Abbott involving both ERCOT and the Public Utility Commission of Texas (PUCT).

"We look forward to working collaboratively with all stakeholders to serve the needs of Texans while also delivering for our shareholders and customers," Schultz said.

Galaxy Digital Wins Conditional ERCOT Clearance for 4.2 GW Texas Data Centers

Image
Galaxy Digital Wins Conditional ERCOT Clearance for 4.2 GW Texas Data Centers

New York – September 13, 2026 -- Galaxy Digital Inc. (Nasdaq: GLXY) said five of its Texas data center projects have received conditional classifications under the Electric Reliability Council of Texas (ERCOT) Batch Zero large load interconnection process, covering approximately 4.2 gigawatts (GW) of gross power capacity.

ERCOT splits Galaxy's projects into base load and studied load categories
Helios I (800 MW) and Helios II (830 MW), both at Galaxy's Helios data center campus, were classified as Batch Zero Base Load, meaning they are modeled in the system-wide study but not subject to further capacity allocation. Helios II's capacity was approved by ERCOT in January 2026, ahead of the March 4 study validation-check date, and forms part of more than 1.6 GW already approved at the Helios site. The project remains on schedule to energize in 2028, and Galaxy said leasing at Helios is not impacted by the process.