Energy, Utilities & Environment

Hornbeck Offshore Sets Nov. 5 Date for Q3 2026 Results Call

Houston – October 19, 2026 -- Hornbeck Offshore Services (NYSE: HOS) will release its third quarter 2026 financial results on Thursday, November 5, 2026, ahead of a live conference call at 9:00 a.m. Eastern (8:00 a.m. Central).

Hornbeck offers dial-in and webcast access to the November 5 call

The company will host the call for investors and analysts, who can join by telephone or by webcast. Results will be published before the call begins.

Telephone replay stays available through November 19, 2026

Investors who miss the live session can access a telephonic replay until November 19, 2026. A webcast archive will remain available for 60 days after the call through the Investors section of the company's website.

Potter Adams, Executive Vice President and CFO, is the company contact for the announcement. Dennard Lascar Investor Relations, represented by Ken Dennard and Alex Harp, handles investor relations.

CCGT Fuel Gas Systems Market to Hit $1.84B by 2031 at 5.4% CAGR

Image
CCGT Fuel Gas Systems Market to Hit $1.84B by 2031 at 5.4% CAGR

Delray Beach – October 19, 2026 -- The global fuel gas system market for combined-cycle power plants will grow from USD 1,410.2 million in 2026 to USD 1,837.7 million by 2031, a compound annual growth rate (CAGR) of 5.4%, according to MarketsandMarkets. The market stood at USD 1,350.0 million in 2025.

Demand is driven by more complex natural gas supply streams, variations in gas composition and stricter fuel-quality requirements. These factors raise the importance of fuel gas conditioning systems in combined-cycle gas turbine (CCGT) applications. Expanding LNG-based supply chains and gas-to-power infrastructure add to adoption of systems that handle varying supply conditions.

YINGFA Brings 28.4% XBC 2.0 and 27.3% TOPCon 3.0 Cells to REI 2026

Image
YINGFA Brings 28.4% XBC 2.0 and 27.3% TOPCon 3.0 Cells to REI 2026

Greater Noida – October 19, 2026 -- YINGFA will present solar cells with measured efficiencies of up to 28.4% at Renewable Energy India Expo 2026, running October 22–24 at India Expo Mart, targeting Indian module manufacturers with cell formats built for varied module designs.

XBC 2.0 cells reach up to 28.4% efficiency with a gridline-free front surface

YINGFA's XBC 2.0 cells combine a pure black appearance with a front surface free of metal gridlines. The company positions them for module designs where both performance and aesthetics matter.

TOPCon 3.0 cells deliver 27.3% in four cut formats

The TOPCon 3.0 line posts a measured cell efficiency of 27.3%. It is available in full-cell, half-cut, third-cut and quarter-cut formats, giving module makers options for different module architectures.

Finnish Study: 40,000 m3 Hydrogen Cavern in Bedrock Costs EUR 30M

Espoo – October 19, 2026 -- A 40,000 cubic metre underground hydrogen storage facility in Finnish crystalline bedrock would cost approximately EUR 30 million and take four to five years to deliver, including planning and permitting, according to a study by VTT Technical Research Centre of Finland and the Geological Survey of Finland GTK.

The Business Finland-funded HUG project is the first comprehensive assessment of hydrogen storage requirements under Finnish conditions. Nearly twenty companies active in Finland's hydrogen economy took part.

BLUETTI Shows 64-240kWh C&I Storage Range at 140th Canton Fair

Image
BLUETTI Shows 64-240kWh C&I Storage Range at 140th Canton Fair

Guangzhou – October 19, 2026 -- BLUETTI showed commercial and industrial (C&I) energy storage systems from 64kWh to 240kWh at the 140th Canton Fair, held October 15 to 19. The company also presented portable and residential products aimed at global distributors and developers.

C&I systems cover peak shaving, arbitrage and backup

The C&I range supports peak shaving, energy arbitrage, critical-load backup and flexible capacity expansion. BLUETTI also presented integrated solar, storage and EV charging systems. These coordinate solar generation, battery storage and EV charging demand, and are designed to reduce grid dependence and manage peak demand.

Energy Producer Files SEC Form 4 on Beneficial Ownership Changes

Image
Energy Producer Files SEC Form 4 on Beneficial Ownership Changes

United States – October 19, 2026 -- An energy company with upstream and midstream operations published a Form 4 statement of changes in beneficial ownership of securities on October 19, 2026.

Form 4 filing appears in the company's SEC Filings news section on October 19, 2026

The filing is listed under the SEC Filings category of the company's news page. Form 4 statements report changes in the beneficial ownership of a company's securities.

The posting carries no further detail. It does not name the insider, the transaction type, the number of securities or the transaction value.

The company's website lists operations covering upstream activity, midstream and marketing, and a unit called Next LVL Energy.

Diversified Energy Delivers ~430 Winter Essentials to Longview Students

Image
Diversified Energy Delivers ~430 Winter Essentials to Longview Students

Longview – October 18, 2026 -- Diversified Energy distributed approximately 430 winter essentials to students at J.L. Everhart Magnet Elementary School in Longview, Texas, in its sixth consecutive year partnering with national nonprofit Operation Warm.

Employees hand out new shoes and socks ahead of colder months

The event took place on a Friday at the school. Diversified Energy employees gave brand-new shoes with socks to local children in need. The natural gas and oil company operates in Texas.

Sixth year of partnership tied to community engagement

Diversified described the initiative as part of its ongoing commitment to philanthropy and volunteer engagement in the communities where it operates. The company said the six-year relationship with Operation Warm reinforces its core value of community engagement.

Zangmu Hydropower Spends 360M Yuan on Fishway for Rare Fish

Beijing – October 18, 2026 -- The Huaneng Zangmu Hydropower Station on the Yarlung Zangbo River spent about 360 million yuan ($53.27 million) on a fishway, and the channel has helped about 570,000 fish pass the dam since the plant began operating in 2015.

The station is about 400 meters long and more than 100 meters high. It covers nearly 26 percent of electricity demand in Xizang Autonomous Region and ended the region's reliance on diesel for large-scale power supply.

Ecological spending extends beyond the fishway

Station head Sun Chao said a fast-flowing fish stock enhancement and release station cost 48 million yuan ($7.10 million) to build. Annual fry-breeding costs are nearly 7 million yuan ($1.04 million). The release project has run for 12 years and has put 1.97 million fish into the river.

Founder Group Wins US$5M EPC Deal for 5.5MW LSS5 Solar Plant

Image
Founder Group Wins US$5M EPC Deal for 5.5MW LSS5 Solar Plant

Kuala Lumpur – October 17, 2026 -- Founder Group Limited (NASDAQ: FGL) has secured a RM19.5 million (approximately US$5 million) engineering, procurement and construction contract for a 5.5MW solar facility under Malaysia's Large Scale Solar 5 (LSS5) programme.

A solar investment company awarded the contract. Founder Group will oversee design, construction, testing and commissioning of the plant.

Plant must reach commercial operation by May 1, 2027

The project carries a guaranteed Maximum Annual Available Capacity (MAAQ) of 13,568.8 megawatt-hours (MWh) for the first two years of operation. Commercial operation is scheduled for May 1, 2027.

CEO Lee Seng Chi said the company aims to achieve energization by early 2027 and cited its track record in utility-scale projects since LSS4.

Founder Group Wins US$8.6M Solar EPC Deal Under Malaysia's LSS5

Image
Founder Group Wins US$8.6M Solar EPC Deal Under Malaysia's LSS5

Kuala Lumpur – October 17, 2026 -- Founder Group Limited (NASDAQ: FGL) has secured an engineering, procurement, construction and commissioning (EPCC) contract valued at RM34 million (about US$8.6 million) under Malaysia's Large Scale Solar 5 (LSS5) programme, lifting its total LSS5 contract value to about RM70 million (about US$17.7 million).

The company won the contract in collaboration with a solar investment company that the source does not name.

Founder Group will build a 9.5 MW facility due online by May 1, 2027

Under the newly signed contract, Founder Group will handle design, construction, testing and commissioning of the 9.5 MW solar facility. The company agreed earlier this month to build the facility under LSS5. Commercial operation is scheduled for no later than May 1, 2027.