MADRID -- November 24, 2026 -- DoGo Power will show a 10-foot containerized energy storage system at GENERA 2026 in Madrid from 24 to 26 November. The enclosure holds the equivalent of six battery cabinets of 260 kWh or more each, at least 1,560 kWh by our calculation. The company says the system transfers between grid-connected and islanded operation in under 20 milliseconds.
The enclosure also carries a combiner, a grid-connection cabinet and an isolation transformer. PV, storage, diesel generation, EV charging and the grid connect to it as a single system. According to DoGo Power, this removes wiring, commissioning hours and the need for a senior electrician on site, and cuts cost before the first kWh is traded. The company will also exhibit utility-scale systems. It says its sales and service network covers more than 30 countries, Europe included.
Spain's grid is leaning on converter-connected resources as renewables pass half of supply
Renewables supplied 53.6% of Spanish electricity in August 2026, and solar alone supplied 29.2%, according to Enerdata figures cited by DoGo Power. Solar therefore made up about 54% of renewable supply that month (29.2 of 53.6 points). All other renewables together supplied about 24.4% of total electricity.
DoGo Power argues that the falling share of rotating synchronous machines means converter-connected resources must now provide stability functions. It says Spain's regulator, the CNMC, has built grid-forming criteria into its generation access capacity framework. The company describes installed storage as still modest against Spain's 2030 target of 22.5 GW. It did not give the current installed figure, so the distance to that target cannot be calculated from the release.
DoGo Power schedules a 25 November workshop on grid-forming sizing and payback
The workshop, themed "Scenario-oriented, grid-forming and AI", is aimed at developers, EPCs and commercial and industrial (C&I) owners in Spain. The company says it will cover three topics:
- which grid conditions justify grid-forming rather than grid-following systems;
- how PV, storage and existing diesel generation are sized together on a constrained site;
- how scheduling turns those assumptions into a payback that holds under real tariffs.
The company frames the target sites as industrial parks and logistics campuses where the grid connection cannot easily be enlarged, tariffs carry a demand component and peaks fall at the wrong hour. Registration for the workshop is by online form. DoGo Power is at Pavilion 9, Stand 9I21, IFEMA Madrid.